Search plants, projects, owners, and states
77 MW Batteries (35 MW) + Solar Photovoltaic (42 MW) operating in Imperial, CA
77 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2025
Operating Since
Coordinates
33.0157, -115.5129
County
Imperial, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ORNI 30 LLC | Ormat Technologies Inc | — |
| Owner(s) | ORNI 30 LLC | Ormat Technologies Inc | — |
| Status | Operating | operating | — |
GEM identifies the owner as Ormat Technologies Inc
This entity is not yet in the GEM ownership database — chain unavailable.
Arrowleaf Solar and Storage is a hybrid power plant located in Imperial County, California. The facility has a total capacity of 77 MW and is operated by ORNI 30 LLC. The plant utilizes both solar photovoltaic technology and battery storage, with MWH listed as the primary fuel type. It consists of two generators and employs a fixed tilt solar tracking system. Arrowleaf operates within the Imperial Irrigation District balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked as the 133rd largest in California out of 300, and 550th nationally out of 1205.
The power plant has available financial data, including a power purchase agreement (PPA) price of $39.12 per MWh, as reported in FERC EQR filings. News coverage of the plant includes 9 articles, with topics ranging from grid-related developments to deals and industry news. Specifically, 5 articles focus on grid issues, 3 on deals, and 1 on industry news.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Imperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
673 MWh
Latest Month
—
Annual Generation
—
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →ORNI 30 LLC · Data from 2025
$39.1/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26
View all 7 articlesNo Ask reports yet for this entity.
Ask about Arrowleaf Solar and StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo