Search plants, projects, owners, and states
26 MW Batteries (13 MW) + Solar Photovoltaic (13 MW) planned in Yolo, CA
26 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
38.6784, -121.9876
County
Yolo, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Emeren US, LLC | — | — |
| Owner(s) | Gibson Renewables LLC | — | — |
| Status | Planned | pre-construction | — |
The Gibson Solar Project - Hybrid is a 26 MW hybrid power plant located in Yolo County, California. The facility is owned and operated by Emeren US, LLC. It utilizes both solar photovoltaic technology and battery storage. The solar component employs a fixed-tilt tracking system.
The plant's primary fuel source is listed as MWH, reflecting its reliance on solar energy and stored electricity. Gibson Solar operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 175th largest power plant in California out of 300, and 662nd nationally out of 1205.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
21.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $40.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
MADISON_1_N001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Gibson Solar Project - HybridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo