Search plants, projects, owners, and states
160 MW Solar operating in Cochise, AZ
160 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2026
Operating Since
Coordinates
31.6566, -110.4134
County
Cochise, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Babacomari Solar, LLC | Clenera LLC | — |
| Owner(s) | Babacomari Solar, LLC | Clenera LLC | — |
| Status | Operating | construction | — |
GEM identifies the owner as Clenera LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Babacomari Solar is a 160 MW solar photovoltaic power plant located in Cochise County, Arizona. The plant, identified by plant ID 67797, is owned and operated by Babacomari Solar, LLC. It utilizes fixed-tilt solar tracking technology. The plant is interconnected to the Tucson Electric Power Company balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
Babacomari Solar is the 10th largest solar plant in Arizona out of 23, and ranks 330th nationally out of 639 solar plants. The plant has been the subject of 7 news articles, with 5 focusing on deals and 2 on industry topics. The primary fuel source for the plant is solar energy (SUN), and it consists of a single generator.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Tucson Electric Power Company (TEPC)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $247.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Babacomari SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.