Search plants, projects, owners, and states
1.8 MW Solar operating in Travis, TX
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
30.2047, -97.6686
County
Travis, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SoCore Energy LLC | — | — |
| Owner(s) | SoCore Energy LLC | — | — |
| Status | Operating | operating | — |
The ABIA Parking Structure is a solar photovoltaic power plant located in Travis County, Texas. The plant, owned and operated by SoCore Energy LLC, has a total capacity of 1.8 MW. It commenced operations in 2021 and utilizes a fixed tilt solar tracking system. The plant is interconnected to the Southwest Power Pool (SPP) balancing authority and resides within the TRE NERC region.
In its most recent year of operation, the ABIA Parking Structure generated 3,161 MWh of electricity, achieving a capacity factor of 20.0%. According to state rankings, the plant is the 284th largest in Texas out of 298 plants. Nationally, it ranks as the 5522nd largest out of 7108 plants. The plant consists of a single generator and its primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
159 MWh
Latest Month
3.2K MWh
Annual Generation
20.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2022–2024
$26.3/MWh
Energy Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Bergstrom Substation · 138 kV
Substation Distance
< 10 km
Operator
Austin Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPPSOUTH_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about ABIA Parking StructureForward forecasts, scenario decomposition, and risk-decision tooling for this asset.