Search plants, projects, owners, and states
226.8 MW BESS planned in Matagorda, TX
226.8 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
28.9745, -95.9938
County
Matagorda, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Gransolar Texas Twelve LLC | — | — |
| Owner(s) | Gransolar Texas Twelve LLC | — | — |
| Status | Planned | — | — |
Ventures BESS is a battery energy storage system located in Matagorda County, Texas. The plant has a total capacity of 226.8 MW and consists of a single generator. It is owned and operated by Gransolar Texas Twelve LLC. The primary fuel type is megawatt-hours (MWH), indicating that it stores and discharges electricity rather than consuming a traditional fuel source.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Ventures BESS ranks as the 81st largest power plant in Texas out of 224, and nationally it ranks 235th out of 514. Recent news coverage of the plant includes 5 articles about deals, 3 about the industry, 1 about regulatory matters, and 1 about the grid.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $308.7M
Market Position
ISO/RTO Market
ERCOT
LMP Node
BAYC_BESS_RN
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-26
View all 10 articlesElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP