100.6 MW Batteries (50 MW) + Solar Photovoltaic (50 MW) planned in Limestone, TX
100.6 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
31.6434, -96.7796
County
Limestone, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Gransolar Texas Sixteen, LLC | Gransolar Group (GRS) | — |
| Owner(s) | Gransolar Texas Sixteen, LLC | Gransolar Group (GRS) | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Gransolar Group (GRS)
This entity is not yet in the GEM ownership database — chain unavailable.
Findley PV and BESS is a hybrid power plant located in Limestone County, Texas. The plant has a total capacity of 100.6 MW and is operated by Gransolar Texas Sixteen, LLC. It consists of two generators utilizing both solar photovoltaic and battery storage technologies, with a fixed tilt solar tracking system. The plant's primary fuel source is electricity (MWH).
Findley PV and BESS operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. Within Texas, the plant ranks as the 199th largest out of 224 power plants. Nationally, it is ranked 476 out of 514. The plant resides within the TRE NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $136.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Prairie Hill Substation · 69 kV
Substation Distance
< 10 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Findley PV and BESS