250 MW Solar operating in Henderson, KY
250 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
37.6930, -87.5490
County
Henderson, KY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sebree Solar, LLC | Sebree Solar LLC | — |
| Owner(s) | Sebree Solar, LLC | Sebree Solar LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Sebree Solar LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Sebree Solar, LLC - Hybrid is a 250 MW solar photovoltaic power plant located in Henderson County, Kentucky. The plant's primary fuel source is solar energy. It is owned and operated by Sebree Solar, LLC. The facility consists of a single generator. The solar array uses a fixed-tilt tracking system.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC Reliability Corporation (SERC) NERC region. Sebree Solar is the second-largest solar plant in Kentucky out of 13 facilities, and ranks 120th nationally out of 639 solar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
250.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
20.9K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $385.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
BREC.SEBREESO2
Pricing Hub
INDIANA.HUB
Alt. Hub / Zone
INDIANA.HUB
Location Type
Generation Node
Node Source
Curated node match
1 buyer • 2 active contracts
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.