2.6 MW Solar operating in Northampton, PA
2.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
40.5818, -75.3573
County
Northampton, PA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Standard Solar | Standard Solar | — |
| Owner(s) | Standard Solar | Standard Solar | — |
| Status | Operating | operating | — |
GEM identifies the owner as Standard Solar
This entity is not yet in the GEM ownership database — chain unavailable.
EDF Saucon Valley is a 2.6 MW solar photovoltaic power plant located in Northampton County, Pennsylvania. The plant began operating in 2024 and has a single generator. Standard Solar is the plant's operator, according to EIA data. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 2,456 MWh, resulting in a capacity factor of 10.7%. EDF Saucon Valley is interconnected to the PJM Interconnection, LLC balancing authority, within the RFC NERC region. In terms of size, the plant ranks 66th out of 87 solar facilities in Pennsylvania, and 4193rd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
3.09 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
188 MWh
Latest Month
2.5K MWh
Annual Generation
10.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $6.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Seidersville Substation · 69 kV
Substation Distance
4.605 km
Operator
PPL
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
QUARRY 69 KV FREEMANS
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about EDF Saucon ValleyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.