1.4 MW Solar operating in Union, IA
1.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
41.0732, -94.3742
County
Union, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Interstate Power and Light Co | Interstate Power and Light | — |
| Owner(s) | Interstate Power and Light Co | Alliant Energy | — |
| Status | Operating | operating | — |
Creston School Customer Hosted Solar is a 1.4 MW solar photovoltaic power plant located in Union County, Iowa. The plant began operating in 2025 and utilizes fixed-tilt solar tracking technology. It is owned by Alliant Energy and operated by Interstate Power and Light Co., a subsidiary of Alliant. The plant's primary fuel source is solar energy (SUN).
The facility operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. According to state rankings, Creston School Customer Hosted Solar is the 26th largest solar plant out of 31 in Iowa. Nationally, it ranks as the 6014th largest out of 7108 solar plants. The plant has one generator.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
24.9 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $2.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Creston Substation · 69 kV
Substation Distance
4.649 km
Operator
Alliant Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.CRSTNSOL
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Creston School Customer Hosted SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.