Search plants, projects, owners, and states
1.8 MW Solar operating in Osage, KS
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
38.6512, -95.8281
County
Osage, KS
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Evergy Kansas Central, Inc | Evergy Kansas Central | — |
| Owner(s) | Evergy Kansas Central, Inc | Evergy | — |
| Status | Operating | operating | — |
Osage City Solar is a 1.8 MW solar photovoltaic power plant located in Osage County, Kansas. The plant began operating in 2024 and is owned and operated by Evergy Kansas Central, Inc., a subsidiary of Evergy. It is the 12th largest solar plant in Kansas out of 39, and ranks 5518th nationally out of 7108 plants. The facility consists of a single generator utilizing fixed-tilt solar tracking.
In its most recent year of operation, Osage City Solar generated 164 MWh of electricity, achieving a capacity factor of 1.0%. The plant is located within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. News reports indicate that the plant has been subject to at least two news articles related to hazards.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
164 MWh
Latest Month
164 MWh
Annual Generation
1.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $2.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Osage City Junction · 115 kV
Substation Distance
< 10 km
Operator
Evergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP North Hub
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Osage City SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.