2 MW Solar operating in Stephenson, IL
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
42.2745, -89.5602
County
Stephenson, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Generate Capital | Generate Capital | — |
| Owner(s) | Generate Community Solar VII, LLC | Generate Capital | — |
| Status | Operating | operating | — |
GEM identifies the owner as Generate Capital
This entity is not yet in the GEM ownership database — chain unavailable.
Trinity Freeport is a 2 MW solar photovoltaic power plant located in Stephenson County, Illinois. The plant began operating in 2024 and has a single generator. It is owned and operated by Generate Capital. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 960 MWh, resulting in a capacity factor of 5.5%. Trinity Freeport operates within the PJM Interconnection, LLC balancing authority and the MRO NERC region. In terms of size, the plant ranks 108th out of 320 solar plants in Illinois and 4685th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
136 MWh
Latest Month
960 MWh
Annual Generation
5.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
N ILLINOIS HUB
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Trinity Freeport