2 MW Solar operating in Clinton, IL
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
38.5823, -89.7004
County
Clinton, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Generate Capital | Generate Capital | — |
| Owner(s) | Generate Community Solar VII, LLC | Generate Capital | — |
| Status | Operating | operating | — |
GEM identifies the owner as Generate Capital
This entity is not yet in the GEM ownership database — chain unavailable.
Trenton West is a 2 MW solar photovoltaic power plant located in Clinton County, Illinois. The plant began operating in 2024 and has a single generator. It is owned and operated by Generate Capital. The plant's primary fuel source is solar energy (SUN), and it utilizes single-axis tracking technology to maximize solar capture.
Trenton West operates within the PJM Interconnection, LLC balancing authority and the MRO NERC region. In its first year of operation, the plant generated 2,168 MWh of electricity, achieving a capacity factor of 12.3%. Trenton West is ranked as the 110th largest solar plant in Illinois out of 320, and nationally it is ranked 4,686 out of 7,108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
180 MWh
Latest Month
2.2K MWh
Annual Generation
12.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
N ILLINOIS HUB
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Trenton WestForward forecasts, scenario decomposition, and risk-decision tooling for this asset.