Search plants, projects, owners, and states
5 MW Solar operating in Ontario, NY
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
43.0350, -77.1484
County
Ontario, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Newark Solar Farm 1 Microgrid, LLC | — | — |
| Owner(s) | Catalyze Newark Solar Farm 1 Microgrid, LLC | — | — |
| Status | Operating | operating | — |
The NY Newark St Rt 31 - Environomics S1 is a 5 MW solar photovoltaic power plant located in Ontario County, New York. The plant began operating in 2024 and has a single generator. It is owned and operated by Catalyze Newark Solar Farm 1 Microgrid, LLC. The plant utilizes single-axis tracking to maximize solar energy capture.
The plant's electricity production is managed by the New York Independent System Operator (NYISO), and it falls within the North American Electric Reliability Corporation (NERC) region of NPCC. In terms of size, the plant ranks 221st out of 695 power plants in New York state, and 2797th out of 7108 plants nationally. The plant's primary fuel source is the sun.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $12.9M
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone B
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about NY Newark St Rt 31 - Environomics S1