Canceled or postponed, according to EIA. Last listed as operating or planned in January 2026. EIA-860M · Sep 2026
100.3 MW BESS in Jim Hogg, TX
100.3 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
27.3839, -98.1244
County
Jim Hogg, TX
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RIC Development, LLC | — | — |
| Owner(s) | RIC Development, LLC | — | — |
| Status | Canceled or postponed | — | — |
Jim Wells BESS is a 100.3 MW battery energy storage system located in Jim Hogg County, Texas. The plant is owned and operated by RIC Development, LLC. It consists of a single generator and utilizes MWH as its primary fuel source, indicating it draws power from the grid to charge its batteries. The facility operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region.
The Jim Wells BESS is ranked as the 201st largest power plant in Texas out of 224 facilities, and nationally it is ranked 479th out of 514. The plant's operation has been the subject of two news articles, one focusing on regulatory aspects and the other on industry-related matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $136.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Premont Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Jim Wells BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.