1 MW Solar operating in Murray, MN
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
43.9817, -95.7658
County
Murray, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | United States Solar Corporation | — | — |
| Owner(s) | United States Solar Corporation | — | — |
| Status | Operating | operating | — |
USS Slayton Solar LLC (CSG) is a 1 MW solar photovoltaic power plant located in Murray County, Minnesota. The plant, which began operating in 2024, is owned and operated by United States Solar Corporation. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) grid and falls within the MRO NERC region.
In its most recent year of operation, USS Slayton Solar generated 627 MWh of electricity, achieving a capacity factor of 7.2%. According to state rankings, the facility is the 471st largest power plant in Minnesota out of 540, and nationally it ranks 6429 out of 7108. The plant consists of a single generator. Its primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
66 MWh
Latest Month
627 MWh
Annual Generation
7.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $1.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Slayton West Substation · 69 kV
Substation Distance
< 10 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about USS Slayton Solar LLC (CSG)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.