Search plants, projects, owners, and states
133.6 MW Natural Gas Fired Combined Cycle (111 MW) + Natural Gas Fired Combustion Turbine (22 MW) operating in Polk, FL
133.6 MW
Nameplate Capacity
4
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combined Cycle + Natural Gas Fired Combustion Turbine
1956
Operating Since
Coordinates
28.0494, -81.9237
County
Polk, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Lakeland - (FL) | City of Lakeland - (FL) | — |
| Owner(s) | City of Lakeland - (FL) | City of Lakeland - (FL) | — |
| Status | Operating | — | — |
Larsen Memorial is a 133.6 MW hybrid power plant located in Polk County, Florida. The plant, which began operating in 1956, is owned and operated by the City of Lakeland. It utilizes both natural gas-fired combined cycle and natural gas-fired combustion turbine technologies. The plant consists of 4 generators.
Larsen Memorial operates within the Florida Municipal Power Pool balancing authority and the SERC NERC region. In terms of size, it is ranked 48th out of 51 power plants in Florida, and 850th out of 945 nationally. The plant's latest annual generation was 298,082 MWh, resulting in a capacity factor of 25.4%.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Municipal Power Pool (FMPP)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
29.2K MWh
Latest Month
298.1K MWh
Annual Generation
25.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1135 lb/MWh
NOx
0.503 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
20.3%
Annual Net Gen
238 GWh
CO₂eq
1136 lb/MWh
Subregion
FRCC All
2013
$965/kW
Est. Construction Cost
Total estimated cost: $128.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Larsen MemorialForward forecasts, scenario decomposition, and risk-decision tooling for this asset.