Search plants, projects, owners, and states
4 MW Solar operating in Litchfield, CT
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
41.9810, -73.1520
County
Litchfield, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NJR Clean Energy Ventures Corporation | NJR Clean Energy Ventures Corp | — |
| Owner(s) | NJR Clean Energy Ventures Corporation | NJR Clean Energy Ventures Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as NJR Clean Energy Ventures Corp
This entity is not yet in the GEM ownership database — chain unavailable.
The Norfolk Landfill Solar Project is a 4 MW solar photovoltaic power plant located in Litchfield County, Connecticut. The plant began operating in 2024 and has one generator. It is owned and operated by NJR Clean Energy Ventures Corporation. The plant uses fixed tilt solar tracking technology.
The Norfolk Landfill Solar Project is connected to the ISO New England Inc. balancing authority and is within the RFC NERC region. In its latest year of operation, the plant generated 494 MWh of electricity, resulting in a capacity factor of 1.4%. The plant ranks 20th out of 88 solar plants in Connecticut and 3529th out of 7108 solar plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
27.6 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
262 MWh
Latest Month
494 MWh
Annual Generation
1.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $10.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.CONNECTICUT
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo