Search plants, projects, owners, and states
2 MW Solar operating in Somerset, ME
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
44.7164, -69.8112
County
Somerset, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Owner(s) | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Status | Operating | operating | — |
GEM identifies the owner as Nautilus Solar Solutions
This entity is not yet in the GEM ownership database — chain unavailable.
BNRG Norridgewock (CSG) is a 2 MW solar photovoltaic power plant located in Somerset County, Maine. The plant began operating in 2024 and has one generator. It is owned and operated by Nautilus Solar Solutions. The plant's primary fuel source is solar energy. BNRG Norridgewock (CSG) is ranked as the 137th largest power plant in Maine out of 153, and 5309th nationally out of 7108.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, the plant generated 171 MWh of electricity, achieving a capacity factor of 1.0%. The solar panels at the facility utilize a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
170 MWh
Latest Month
171 MWh
Annual Generation
1.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $5.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about BNRG Norridgewock (CSG)