Search plants, projects, owners, and states
5 MW Solar operating in Aroostook, ME
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
46.5310, -68.3393
County
Aroostook, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Owner(s) | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Status | Operating | operating | — |
GEM identifies the owner as Nautilus Solar Solutions
This entity is not yet in the GEM ownership database — chain unavailable.
BNRG Masardis (CSG) is a 5 MW solar photovoltaic power plant located in Aroostook County, Maine. The plant began operating in 2024 and utilizes fixed tilt solar tracking technology. It consists of a single generator and is owned and operated by Nautilus Solar Solutions.
The plant's output is dispatched into the ISO New England Inc. balancing authority, within the Northeast Power Coordinating Council (NPCC) NERC region. BNRG Masardis (CSG) ranks as the 50th largest power plant in Maine out of 153 facilities, and it holds the rank of 2834 nationally out of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $12.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo