Search plants, projects, owners, and states
5 MW Solar operating in Fulton, NY
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
42.9930, -74.3110
County
Fulton, NY
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | County Highway Solar 2, LLC | AES Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
County Highway Solar 2 (CSG) is a 5 MW solar photovoltaic power plant located in Fulton County, New York. The plant began operating in 2025 and has a single generator. AES Clean Energy is the plant's operator. The facility utilizes fixed-tilt solar tracking technology.
The plant's balancing authority is the New York Independent System Operator (NYISO), and it is situated within the Northeast Power Coordinating Council (NPCC) NERC region. County Highway Solar 2 ranks as the 214th largest solar plant in New York out of 695, and it holds the 2768th position nationally among 7108 solar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $12.9M
Point of Interconnection
Nearest Substation
FULTON___LFGE
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone F
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about County Highway Solar 2 (CSG)