Search plants, projects, owners, and states
3 MW Solar operating in Aroostook, ME
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
46.6837, -68.0382
County
Aroostook, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Owner(s) | Nautilus Solar Solutions | Nautilus Solar Solutions | — |
| Status | Operating | operating | — |
GEM identifies the owner as Nautilus Solar Solutions
This entity is not yet in the GEM ownership database — chain unavailable.
Mechanic Street (CSG) is a 3 MW solar photovoltaic power plant located in Aroostook County, Maine. The plant began operating in 2024 and has one generator. Nautilus Solar Solutions is the plant's operator. The facility's solar arrays utilize a fixed tilt tracking system.
The plant's latest annual generation was 3 MWh, resulting in a capacity factor of 0.0%. Mechanic Street (CSG) is interconnected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region. The plant ranks 122nd out of 153 power plants in Maine and 3870th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
3 MWh
Latest Month
3 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $7.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.