Search plants, projects, owners, and states
1.6 MW Natural Gas operating in Dallas, TX
1.6 MW
Nameplate Capacity
4
Generators
units
Natural Gas Internal Combustion Engine
Technology
2023
Operating Since
Coordinates
32.8185, -96.8532
County
Dallas, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Generate ER-NG, LLC | — | — |
| Owner(s) | Generate ER-NG, LLC | — | — |
| Status | Operating | — | — |
The OTHERBenEKDallas power plant is located in Dallas County, Texas. The facility, owned and operated by Generate ER-NG, LLC, has a total capacity of 1.6 MW. It consists of four generators utilizing natural gas-fired internal combustion engine technology. The plant began operating in 2023.
The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. In its latest year of operation, the plant generated 198 MWh of electricity, achieving a capacity factor of 1.4%. The OTHERBenEKDallas plant ranks 189th out of 312 power plants in Texas and 1754th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
14 MWh
Latest Month
198 MWh
Annual Generation
1.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2008 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
40 lb/MWh
SO₂
0.052 lb/MWh
CH₄
0.038 lb/MWh
N₂O
0.004 lb/MWh
Capacity Factor
0.8%
Annual Net Gen
0 GWh
CO₂eq
2010 lb/MWh
Subregion
ERCOT All
2023
$782/kW
Est. Construction Cost
Total estimated cost: $1.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Record Crossing Substation · 138 kV
Substation Distance
< 10 km
Operator
Oncor
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about OTHERBenEKDallasForward forecasts, scenario decomposition, and risk-decision tooling for this asset.