1.2 MW Batteries (0 MW) + Solar Photovoltaic (1 MW) operating in Barnstable, MA
1.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2022
Operating Since
Coordinates
41.7321, -70.0166
County
Barnstable, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Freemans Way Solar Project 2019, LLC | — | — |
| Owner(s) | Freemans Way Solar Project 2019, LLC | — | — |
| Status | Operating | — | — |
The CVEC Round 4 Brewster Captn Golf Course is a hybrid power plant located in Barnstable County, Massachusetts. It is owned and operated by Freemans Way Solar Project 2019, LLC. The plant began operating in 2022 and has a total capacity of 1.2 MW, distributed across two generators. The facility combines solar photovoltaic generation with battery energy storage. The battery energy storage system (BESS) has a capacity of 0.9 MWh and a duration of 2.25 hours, utilizing lithium-ion battery chemistry (LIB).
The plant's primary fuel source is listed as MWH, referring to the electricity used to charge the batteries. The solar array uses single-axis tracking. In its most recent year of operation, the plant generated 1093 MWh, achieving a capacity factor of 10.4%. The CVEC Round 4 Brewster Captn Golf Course operates within the ISO New England Inc. balancing authority and the NPCC NERC region. It is ranked as the 125th largest power plant out of 126 in Massachusetts, and 1181st out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
22.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
36 MWh
Latest Month
1.1K MWh
Annual Generation
10.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2022
$2,409/kW
Est. Construction Cost
Total estimated cost: $2.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Orleans Substation · 115 kV
Substation Distance
< 10 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CVEC Round 4 Brewster Captn Golf CourseForward forecasts, scenario decomposition, and risk-decision tooling for this asset.