Search plants, projects, owners, and states
10 MW Batteries (5 MW) + Solar Photovoltaic (5 MW) under construction in Bristol, MA
10 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
41.6615, -71.0600
County
Bristol, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Highland Ave Solar 1, LLC | — | — |
| Owner(s) | Highland Ave Solar 1, LLC | — | — |
| Status | Under construction | construction | — |
The Borrego - Highland Ave facility is a 10 MW hybrid power plant located in Bristol County, Massachusetts. It is owned and operated by Highland Ave Solar 1, LLC. The plant utilizes both solar photovoltaic technology and batteries, with two generators on site. The primary fuel source is listed as MWH (megawatt-hours), indicating the plant stores and discharges electricity. The solar array uses a fixed tilt configuration.
Borrego - Highland Ave operates within the ISO New England Inc. balancing authority and the NPCC NERC region. It holds a rank of 3 out of 126 similar facilities in Massachusetts, and a national rank of 772 out of 1205. This ranking suggests it is a significant, though not the largest, contributor to the state's renewable energy portfolio.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $25.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Cross Road Substation · 115 kV
Substation Distance
4.512 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.CROSS_RD13.2109A_LD
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo