Search plants, projects, owners, and states
2 MW Solar operating in McHenry, IL
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
42.4621, -88.6119
County
McHenry, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as Greenbacker Renewable Energy Corp
This entity is not yet in the GEM ownership database — chain unavailable.
Lobelia 1 is a 2 MW solar photovoltaic power plant located in McHenry County, Illinois. The plant began operating in 2024 and utilizes single-axis tracking technology. It has one generator. Greenbacker Renewable Energy Corporation is the owner and operator.
The plant's output is delivered to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority, within the SERC Reliability Corporation (SERC) NERC region. Lobelia 1 ranks as the 245th largest power plant in Illinois out of 320, and 5325th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lobelia 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo