45 MW Solar operating in Fillmore, MN
45 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
43.5520, -92.3570
County
Fillmore, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Geronimo Power | National Grid Renewables | — |
| Owner(s) | National Grid Renewables | National Grid Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as National Grid Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Fillmore County Solar Project is a 45 MW solar photovoltaic plant located in Fillmore County, Minnesota. The plant began operating in 2024 and utilizes single-axis tracking. It is owned and operated by National Grid Renewables. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is within the MRO NERC region.
In its most recent year of operation, the Fillmore County Solar Project generated 82,970 MWh of electricity, achieving a capacity factor of 21.0%. The plant ranks 9th out of 540 solar facilities in Minnesota and 1213th out of 7108 solar facilities nationally. Financial data is available for the plant from LBNL, and the plant has been mentioned in 10 news articles, primarily related to industry and grid topics.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.5K MWh
Latest Month
83.0K MWh
Annual Generation
21.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2024
$53.3/MWh
LCOE
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
DPC.FILMOR.SLR
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Fillmore County Solar ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.