160 MW Solar operating in Henderson, KY
160 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
37.6520, -87.5520
County
Henderson, KY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Geronimo Power | National Grid Renewables | — |
| Owner(s) | National Grid Renewables | National Grid Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as National Grid Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
Unbridled Solar is a 160 MW solar photovoltaic power plant located in Henderson County, Kentucky. The plant, which began operating in 2025, is owned and operated by National Grid Renewables. It utilizes a fixed tilt solar tracking system and consists of a single generator. Unbridled Solar is connected to the Midcontinent Independent Transmission System Operator (MISO) grid and falls within the SERC NERC region.
In its latest year of operation, Unbridled Solar generated 279,804 MWh of electricity, achieving a capacity factor of 23.8%. The plant is the 9th largest solar facility in Kentucky (out of 13) and ranks 329th nationally (out of 639).
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
161.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
9.8K MWh
Latest Month
279.8K MWh
Annual Generation
23.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $246.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
BREC.UNBRIDLED
Pricing Hub
—
Alt. Hub / Zone
INDIANA.HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-03-14