Search plants, projects, owners, and states
77 MW BESS operating in Kern, CA
77 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2020
Operating Since
Coordinates
35.0442, -118.2756
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Terra-Gen Operating Co-BESS 2 | — | — |
| Owner(s) | Terra-Gen Operating Co-BESS 2 | — | — |
| Status | Operating | — | — |
The Mojave 16/17/18 BESS is a 77 MW battery energy storage system located in Kern County, California. The plant began operating in 2020 and is owned and operated by Terra-Gen Operating Co-BESS 2. It consists of a single generator utilizing lithium-ion battery (LIB) technology. The plant's storage capacity is 77 MWh, providing a duration of 1 hour at full power.
The Mojave 16/17/18 BESS operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of capacity, it ranks as the 134th largest power plant in California out of 300, and 549th nationally out of 1205. The plant's primary fuel is electricity (MWH), indicating it charges from the grid.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−265 MWh
Net Charging
-3.1K MWh
Annual Net Energy
-0.5%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2020
$758/kW
Est. Construction Cost
Total estimated cost: $58.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
WSTWND_7_N006
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Mojave 16/17/18 BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo