2 MW Solar operating in Pierce, WI
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
44.6252, -92.5757
County
Pierce, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as Greenbacker Renewable Energy Corp
This entity is not yet in the GEM ownership database — chain unavailable.
The Trimbelle (Pierce Pepin) solar photovoltaic plant is located in Pierce County, Wisconsin. The plant, owned and operated by Greenbacker Renewable Energy Corporation, has a total capacity of 2 MW consisting of a single generator. It began operating in 2024 and utilizes fixed-tilt solar tracking technology.
The plant's latest annual generation was 2,957 MWh, resulting in a capacity factor of 16.8%. Trimbelle (Pierce Pepin) operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. It is ranked as the 68th largest solar plant in Wisconsin out of 99, and 5284th nationally out of 7108. The plant's NERC region is MRO.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
70 MWh
Latest Month
3.0K MWh
Annual Generation
16.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $3.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Trenton Substation · 69 kV
Substation Distance
3.768 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.PRISL1
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Trimbelle (Pierce Pepin)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.