2.5 MW BESS operating in Edgecombe, NC
2.5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
35.8442, -77.6127
County
Edgecombe, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina El Member Corp | — | — |
| Owner(s) | North Carolina El Member Corp | — | — |
| Status | Operating | — | — |
Davistown-Mercer is a battery energy storage system (BESS) located in Edgecombe County, North Carolina. The plant has a total capacity of 2.5 MW and consists of a single generator. Davistown-Mercer began operating in 2024 and is owned and operated by North Carolina El Member Corp. The facility utilizes lithium-ion batteries (LIB) and has a total storage capacity of 5 MWh, providing a duration of 2 hours.
Davistown-Mercer operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. In terms of size, the plant ranks 31st out of 36 similar facilities in North Carolina, and 1088th out of 1205 nationally. The plant's primary fuel type is listed as 'MWH', indicating it draws power from the grid to charge its batteries.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.2 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
−18 MWh
Net Charging
-18 MWh
Annual Net Energy
-0.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $3.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Davistown-MercerForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo