1.5 MW Solar operating in Dunn, WI
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
44.9710, -91.8045
County
Dunn, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Corp | — |
| Status | Operating | operating | — |
GEM identifies the owner as Greenbacker Renewable Energy Corp
This entity is not yet in the GEM ownership database — chain unavailable.
Walleye (Dunn 2) is a 1.5 MW solar photovoltaic power plant located in Dunn County, Wisconsin. The plant began operating in 2024 and has a single generator. It is owned and operated by Greenbacker Renewable Energy Corporation. The facility utilizes single-axis tracking to maximize solar energy capture.
In its most recent year of operation, Walleye (Dunn 2) generated 2,782 MWh of electricity, achieving a capacity factor of 21.1%. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is within the NERC MRO region. Walleye (Dunn 2) ranks as the 77th largest power plant in Wisconsin out of 99, and nationally it ranks 5695 out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
58 MWh
Latest Month
2.8K MWh
Annual Generation
21.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $2.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Tainter · 69 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.