Search plants, projects, owners, and states
1.4 MW Solar operating in Los Angeles, CA
1.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
33.8532, -118.2968
County
Los Angeles, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Valta Energy | TRITEC Americas | — |
| Owner(s) | Valta Energy | TRITEC Americas | — |
| Status | Operating | operating | — |
GEM identifies the owner as TRITEC Americas
This entity is not yet in the GEM ownership database — chain unavailable.
VS BC Pacific Gateway, LLC is a solar photovoltaic power plant located in Los Angeles County, California. The plant has a total capacity of 1.4 MW and began operating in 2025. It is owned and operated by Valta Energy. The facility consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's location places it within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Based on capacity, VS BC Pacific Gateway, LLC ranks as the 663rd largest solar facility in California out of 862, and 5965th nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $2.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
HAL_SUB_LNODEON1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about VS BC Pacific Gateway, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoCalifornia Independent System Operator (CISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP