Search plants, projects, owners, and states
495 MW Batteries (195 MW) + Solar Photovoltaic (300 MW) planned in Clark, NV
495 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
36.5580, -115.7990
County
Clark, NV
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | EDF Renewables Development, Inc. | EDF Renewables | — |
| Owner(s) | EDF Renewables Development, Inc. | EDF Renewables | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as EDF Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Bonanza Solar and Storage Project, located in Clark County, Nevada, has a total capacity of 495 MW. The hybrid plant combines solar photovoltaic generation with battery storage. It is owned and operated by EDF Renewables Development, Inc. and consists of two generators. The primary fuel type is listed as MWH, reflecting the storage component.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Bonanza Solar and Storage is ranked as the 7th largest solar facility in Nevada out of 20, and 65th nationally out of 514 facilities. The solar component utilizes a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $673.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
Plant coordinates only
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.