330 MW Batteries (180 MW) + Solar Photovoltaic (150 MW) planned in Fisher, TX
330 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
32.6281, -100.2360
County
Fisher, TX
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Innovative Solar 245 LLC | Innovative Solar Systems | — |
| Owner(s) | Innovative Solar 245 LLC | Innovative Solar Systems | — |
| Status | Planned | announced | — |
GEM identifies the owner as Innovative Solar Systems
This entity is not yet in the GEM ownership database — chain unavailable.
Indigo Solar & Storage is a 330 MW hybrid power plant located in Fisher County, Texas. The facility, identified by plant ID 66891, is owned and operated by Innovative Solar 245 LLC. It utilizes both solar photovoltaic and battery storage technologies, with MWH listed as the primary fuel type. The solar array employs a fixed tilt tracking system.
The plant consists of two generators and operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, falling under the NERC region TRE. Indigo Solar & Storage is ranked as the 39th largest power plant in Texas out of 224, and nationally it holds the 123rd position out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $449.1M
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
Plant coordinates only
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.