Search plants, projects, owners, and states
2 MW Solar operating in Washington, MD
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
39.6301, -77.9099
County
Washington, MD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | Big Spring Solar LLC | AES Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Big Spring Solar (CSG) is a 2 MW solar photovoltaic power plant located in Washington County, Maryland. The plant began operating in 2024 and has one generator. It is owned and operated by AES Clean Energy. The primary fuel source for electricity generation is solar energy. The plant utilizes single-axis tracking technology to maximize solar energy capture.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In its first year of operation, Big Spring Solar generated 264 MWh of electricity, resulting in a capacity factor of 1.5%. Based on capacity, Big Spring Solar ranks as the 110th largest solar plant in Maryland out of 183, and 4684th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
108 MWh
Latest Month
264 MWh
Annual Generation
1.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $3.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Big Spring Solar (CSG)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo