9.9 MW BESS operating in Angelina, TX
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
31.2920, -94.7242
County
Angelina, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | HEN Infrastructure, L.L.C. | Hunt Energy Network | — |
| Owner(s) | Hunt Energy Network, LLC, John Hancock Funding Company, Manulife Infrastructure II Holdings A, L.P. | Hunt Energy | — |
| Status | Operating | — | — |
Lufkin South BESS is a 9.9 MW battery energy storage system located in Angelina County, Texas. The plant began operating in 2024 and has one generator. It is owned by Hunt Energy and operated by HEN Infrastructure, L.L.C. The facility utilizes lithium-ion batteries (LIB) and has a total storage capacity of 9.9 MWh, providing a duration of 1 hour at full output.
The Lufkin South BESS operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In terms of size, it ranks as the 285th largest power plant in Texas out of 313, and 840th nationally out of 1205. The plant's primary fuel type is electricity (MWH), indicating it draws power from the grid to charge its batteries.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
−19 MWh
Net Charging
-225 MWh
Annual Net Energy
-0.3%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $13.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Lufkin South Substation · 138 kV
Substation Distance
0 km
Operator
Oncor
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
LFSTH_RN
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lufkin South BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.