Search plants, projects, owners, and states
408.9 MW Solar operating in Hill, TX
408.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
31.9008, -97.0337
Reference point reported to EIA.
County
Hill, TX
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
5 mapped line sections connect the two facilities over 34.157 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Reported owner: Ash Creek
EIA Schedule 4 · 2025. The owner name is corroborated by the plant name and organization catalog. Other source claims are shown below.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ash Creek | Primergy Solar | — |
| Owner(s) | Ash Creek | Primergy Solar | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Ash Creek Solar is a 408.9 MW solar photovoltaic power plant located in Hill County, Texas. The plant began operating in 2025 and is owned and operated by Ash Creek. It utilizes a single generator and fixed-tilt solar tracking technology. Ash Creek Solar is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and resides within the SERC NERC region.
In its latest year of operation, Ash Creek Solar generated 405,591 MWh of electricity, achieving a capacity factor of 19.3%. The plant is a significant solar energy producer in Texas, ranking as the 18th largest out of 192 solar plants in the state. Nationally, it holds a rank of 35 out of 639 solar plants.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
35.1K MWh
Latest Month
405.6K MWh
Annual Generation
19.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $630.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Sam Switching Station · 345 kV
Substation Distance
1.49 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ASCK_SLR_RN
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.