Search plants, projects, owners, and states
20 MW BESS operating in Hunterdon, NJ
20 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
40.5263, -74.8441
County
Hunterdon, NJ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | VESI 23 LLC | — | — |
| Owner(s) | VESI 23 LLC | — | — |
| Status | Operating | — | — |
Justin Court Energy Storage is a 20 MW battery energy storage system (BESS) located in Hunterdon County, New Jersey. The facility, which began operating in 2024, is owned and operated by VESI 23 LLC. It is the largest of 10 battery storage plants in New Jersey, and ranks 703 out of 1205 nationally. The plant consists of a single generator utilizing battery technology with MWH as its primary fuel.
The BESS has a total storage capacity of 18.3 MWh, providing a duration of approximately 0.92 hours. The battery chemistry is lithium-ion (LIB). The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−209 MWh
Net Charging
-4.3K MWh
Annual Net Energy
-2.4%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $27.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
EFLEMING35 KV COPHILSP
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Justin Court Energy StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.