Search plants, projects, owners, and states
46.8 MW Natural Gas operating in Stanislaus, CA
46.8 MW
Nameplate Capacity
4
Generators
units
Natural Gas Internal Combustion Engine
Technology
2024
Operating Since
Coordinates
37.4359, -121.1310
County
Stanislaus, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Enchanted Rock | Enchanted Rock | — |
| Owner(s) | Enchanted Rock | Enchanted Rock Holdings | — |
| Status | Operating | — | — |
Enchanted Rock Turlock Irrigation Distri is a 46.8 MW natural gas-fired power plant located in Stanislaus County, California. The plant began operating in 2024 and utilizes four natural gas internal combustion engine generators. It is owned by Enchanted Rock Holdings and operated by Enchanted Rock.
The plant's balancing authority is the Turlock Irrigation District, and it operates within the Western Electricity Coordinating Council (WECC) NERC region. Based on total capacity, the plant ranks as the 135th largest in California out of 297 plants, and 1147th nationally out of 1963 plants. Recent news articles indicate grid-related interest in the facility.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Turlock Irrigation District (TIDC)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
State
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$782/kW
Est. Construction Cost
Total estimated cost: $36.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Enchanted Rock Turlock Irrigation DistriForward forecasts, scenario decomposition, and risk-decision tooling for this asset.