Search plants, projects, owners, and states
3 MW Solar operating in Tulare, CA
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
36.3068, -119.2400
County
Tulare, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dimension Energy LLC | — | — |
| Owner(s) | Dimension Energy LLC | — | — |
| Status | Operating | operating | — |
Visalia CSG LLC is a 3 MW solar photovoltaic power plant located in Tulare County, California. The plant began operating in 2024 and has a single generator. It is owned and operated by Dimension Energy LLC. The plant's electricity is delivered to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) region.
In its most recent year of operation, Visalia CSG LLC generated 6,380 MWh of electricity, achieving a capacity factor of 24.2%. The facility utilizes single-axis solar tracking technology to maximize energy production. The plant ranks 417th in size among California's 862 power plants, and 3843rd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
277 MWh
Latest Month
6.4K MWh
Annual Generation
24.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Rector Substation · 220 kV
Substation Distance
0.757 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
RECTOR_6_N020
Pricing Hub
TH_SP15_GEN-APND
Alt. Hub / Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Visalia CSG LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.