3 MW Solar operating in Tulare, CA
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
36.3068, -119.2400
County
Tulare, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dimension Energy LLC | — | — |
| Owner(s) | Dimension Energy LLC | — | — |
| Status | Operating | operating | — |
Visalia CSG LLC is a 3 MW solar photovoltaic power plant located in Tulare County, California. The plant began operating in 2024 and has a single generator. It is owned and operated by Dimension Energy LLC. The plant's electricity is delivered to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) region.
In its most recent year of operation, Visalia CSG LLC generated 6,380 MWh of electricity, achieving a capacity factor of 24.2%. The facility utilizes single-axis solar tracking technology to maximize energy production. The plant ranks 417th in size among California's 862 power plants, and 3843rd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
277 MWh
Latest Month
6.4K MWh
Annual Generation
24.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
Point of Interconnection
Nearest Substation
Rector Substation · 220 kV
Substation Distance
0.757 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
RECTOR_6_N020
Pricing Hub
TH_SP15_GEN-APND
Alt. Hub / Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Visalia CSG LLC