750 MW Batteries (260 MW) + Solar Photovoltaic (490 MW) operating in Maricopa, AZ
750 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.2441, -112.5403
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
Source imagery: 2025-03-11.
County
Maricopa, AZ
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 5.049 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sonoran Solar Energy, LLC | NextEra Energy Inc | — |
| Owner(s) | Sonoran Solar Energy, LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Sonoran Solar Energy is a 750 MW hybrid power plant located in Maricopa County, Arizona. The facility, which began operating in 2023, combines solar photovoltaic generation with battery energy storage. It is owned by NextEra Energy and operated by Sonoran Solar Energy, LLC. The plant utilizes single-axis tracking for its solar panels. The battery energy storage system (BESS) has a capacity of 1040 MWh and a duration of 4 hours, employing lithium-ion battery chemistry (LIB).
The plant's latest annual generation was 1,077,137 MWh, resulting in a capacity factor of 16.4%. Sonoran Solar Energy operates within the Salt River Project balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks as the 7th largest in Arizona out of 47 facilities and 31st nationally out of 514. Financial data indicates a power purchase agreement (PPA) price of $18.31 per MWh.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Salt River Project (SRP)
Grid Voltage
500.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
56.0K MWh
Latest Month
1.1M MWh
Annual Generation
16.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Sonoran Solar Energy, LLC · Data from 2023–2025
$14.4/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
1 buyer • 10 active contracts
Last updated 2026-03-26
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.