Search plants, projects, owners, and states
88 MW Batteries (40 MW) + Solar Photovoltaic (48 MW) operating in San Bernardino, CA
88 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
35.0181, -117.5660
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
USPVDB reports uncertainty matching these polygons to EIA records.
Source imagery: 2023-11-11.
The reference point needs review; its current location has been retained.
County
San Bernardino, CA
Nearby Plants
Voltage information is incomplete along this route; the electrical connection remains unconfirmed.
2 mapped line sections connect the two facilities over 0.488 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Resurgence Solar II | NextEra Energy | — |
| Owner(s) | Resurgence Solar II | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Resurgence Solar II is an 88 MW hybrid power plant located in San Bernardino County, California. The facility, which began operating in 2023, is owned and operated by NextEra Energy via its subsidiary, Resurgence Solar II. The plant utilizes both solar photovoltaic technology and battery energy storage. It features single-axis solar tracking and a 300 MWh lithium-ion battery energy storage system (BESS) with a 7.5-hour duration. Resurgence Solar II operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
The plant's primary fuel source is listed as MWH, reflecting its reliance on solar energy. In its latest year of operation, Resurgence Solar II generated 134,683 MWh of electricity, achieving a capacity factor of 17.5%. The facility is ranked 120th out of 300 power plants in California and 527th out of 1205 plants nationally. Financial data is available for the plant from sources such as Lawrence Berkeley National Laboratory (LBNL).
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6.5K MWh
Latest Month
134.7K MWh
Annual Generation
17.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2023–2024
$9.2/MWh
Energy Value
$6.9/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Segs 7
Substation Distance
0.177 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
SUNGEN7G_7_N005
Pricing Hub
TH_SP15_GEN-APND
Node Source
Curated node match
1 buyer • 10 active contracts
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Top plants by capacity for NextEra Energy
Structured data lookup for NextEra Energy with rankings and aggregations.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra entity test
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.