11.2 MW Natural Gas operating in Fort Bend, TX
11.2 MW
Nameplate Capacity
28
Generators
units
Natural Gas Internal Combustion Engine
Technology
2021
Operating Since
Coordinates
29.5753, -95.6369
County
Fort Bend, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Generate ER-NG, LLC | — | — |
| Owner(s) | Generate ER-NG, LLC | — | — |
| Status | Operating | — | — |
FTBLID2 is a natural gas-fired power plant located in Fort Bend County, Texas. The plant has a total capacity of 11.2 MW, distributed across 28 natural gas-fueled internal combustion engine generators. It began operating in 2021 and is owned and operated by Generate ER-NG, LLC. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, in the TRE NERC region.
In its most recent year of operation, FTBLID2 generated 130 MWh of electricity, achieving a capacity factor of 0.1%. The plant is ranked as the 171st largest power plant in Texas out of 312, and nationally it is ranked 1425 out of 1963.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
9 MWh
Latest Month
130 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1650 lb/MWh
NOx
33 lb/MWh
SO₂
0.046 lb/MWh
CH₄
0.031 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
1.9%
Annual Net Gen
2 GWh
CO₂eq
1652 lb/MWh
Subregion
ERCOT All
2021
$920/kW
Est. Construction Cost
Total estimated cost: $10.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Imperial Substation · 138 kV
Substation Distance
< 10 km
Operator
CenterPoint Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_HOUSTON
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about FTBLID2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.