Search plants, projects, owners, and states
0.9 MW Solar operating in Goodhue, MN
0.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
44.3845, -92.5712
County
Goodhue, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sturgeon Garden LLC | Sturgeon Garden | — |
| Owner(s) | Sturgeon Garden LLC | — | — |
| Status | Operating | operating | — |
Sturgeon Garden is a solar photovoltaic power plant located in Goodhue County, Minnesota. The plant, owned and operated by Sturgeon Garden LLC, has a total capacity of 0.9 MW. It commenced operations in 2023 and consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture.
In its most recent year of operation, Sturgeon Garden generated 2,126 MWh of electricity, achieving a capacity factor of 26.9%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, and is located within the MRO NERC region. In terms of size, Sturgeon Garden is ranked as the 538th largest power plant in Minnesota out of 540, and 7098th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
59 MWh
Latest Month
2.1K MWh
Annual Generation
26.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $1.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Sturgeon Garden