200 MW Wind operating in Morrow, OR
200 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2025
Operating Since
Coordinates
45.5426, -119.3822
County
Morrow, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wheatridge East Wind LLC | NextEra Energy Inc | — |
| Owner(s) | Wheatridge East Wind LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Wheatridge East Wind is a 200 MW wind power plant located in Morrow County, Oregon. The facility, which began operating in 2025, utilizes onshore wind turbine technology. It is owned by NextEra Energy and operated by Wheatridge East Wind LLC. The plant is interconnected to the Bonneville Power Administration balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The plant's latest annual generation was 270,057 MWh, achieving a capacity factor of 26.1%. Wheatridge East Wind ranks as the 8th largest wind farm in Oregon out of 17, and nationally it ranks 319th out of 734 wind plants. The facility consists of one generator.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
70.1K MWh
Latest Month
270.1K MWh
Annual Generation
26.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $422.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
1 buyer • 3 active contracts