Search plants, projects, owners, and states
215 MW Solar under construction in Jones, TX
215 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
32.7812, -100.0065
County
Jones, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lightsource Renewable Energy Asset Management, LLC | Lightsource BP | — |
| Owner(s) | Jones City Solar, LLC | Lightsource BP | — |
| Status | Under construction | construction | — |
GEM identifies the owner as Lightsource BP
This entity is not yet in the GEM ownership database — chain unavailable.
Jones City 1 Solar is a 215 MW solar photovoltaic power plant located in Jones County, Texas. The plant, identified by the EIA plant code 66559, is operated by Lightsource Renewable Energy Asset Management, LLC. It utilizes a single generator and fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy (SUN).
The facility operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. Jones City 1 Solar is ranked as the 86th largest power plant in Texas out of 192 plants and the 184th largest in the United States out of 639 plants. Recent news coverage indicates activity related to deals involving the plant.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $331.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Radium Substation · 138 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-04-19
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
—
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.