Search plants, projects, owners, and states
Canceled or postponed, according to EIA. Last listed as operating or planned in December 2025. EIA-860M · Sep 2026
2.2 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) in Monterey, CA
2.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
36.8649, -121.7767
County
Monterey, CA
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Moss Landing Hilltop Rd Microgrid, LLC | Catalyze Moss Landing Hilltop Rd Microgrid | — |
| Owner(s) | Catalyze Moss Landing Hilltop Rd Microgrid, LLC | — | — |
| Status | Canceled or postponed | construction | — |
The Catalyze Moss Landing Hilltop Rd Microgrid, located in Monterey County, California, is a hybrid power plant with a total capacity of 2.2 MW. The facility is owned and operated by Catalyze Moss Landing Hilltop Rd Microgrid, LLC. The plant utilizes both solar photovoltaic technology and batteries, with the primary fuel listed as MWH. The solar component uses a fixed tilt tracking system.
The plant consists of two generators and operates within the California Independent System Operator (CAISO) balancing authority, part of the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 260th out of 300 power plants in California and 1101st out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $3.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_NP15_GEN-APND
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CA Moss Landing 3040 Hilltop RdForward forecasts, scenario decomposition, and risk-decision tooling for this asset.