Search plants, projects, owners, and states
35.7 MW Natural Gas Internal Combustion Engine (34 MW) + Petroleum Liquids (2 MW) operating in Miami Dade, FL
35.7 MW
Nameplate Capacity
11
Generators
units
Hybrid (2)
Technology
Natural Gas Internal Combustion Engine + Petroleum Liquids
1970
Operating Since
Coordinates
25.4753, -80.4697
County
Miami Dade, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Homestead - (FL) | — | — |
| Owner(s) | City of Homestead - (FL) | — | — |
| Status | Operating | — | — |
The G W Ivey plant, located in Miami Dade County, Florida, is a 35.7 MW hybrid power plant owned and operated by the City of Homestead. Commissioned in 1970, the plant consists of 11 generators utilizing natural gas internal combustion engines and petroleum liquids as fuel sources. It operates within the City of Homestead balancing authority and the SERC NERC region.
The plant is ranked 55th out of 68 power plants in Florida and 1207th out of 1963 plants nationally. Its primary fuel source is natural gas.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
City of Homestead (HST)
Grid Voltage
13.2 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$965/kW
Est. Construction Cost
Total estimated cost: $34.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about G W IveyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.