Search plants, projects, owners, and states
3 MW Batteries (2 MW) + Solar Photovoltaic (2 MW) under construction in San Bernardino, CA
3 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
34.0552, -117.3778
County
San Bernardino, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC | Catalyze Bloomington 2551 S Lilac Avenue Microgrid | — |
| Owner(s) | Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC | — | — |
| Status | Under construction | construction | — |
The CA Bloomington 2551 S Lilac Avenue Micro plant, located in San Bernardino County, California, has a total capacity of 3 MW. The facility is operated by Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC. It is a hybrid plant utilizing both solar photovoltaic and battery technologies. The solar array uses a fixed tilt tracking system.
The plant consists of 2 generators and its primary fuel source is listed as 'MWH'. It operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked 245th out of 300 facilities in California and 1058th out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
AGUAMNSA_7_B1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CA Bloomington 2551 S Lilac Avenue MicroForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo