10.8 MW Distillate Oil operating in Bucks, PA
10.8 MW
Nameplate Capacity
4
Generators
units
Petroleum Liquids
Technology
2023
Operating Since
Coordinates
40.4465, -75.3404
County
Bucks, PA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | American Mun Power-Ohio, Inc | — | — |
| Owner(s) | American Mun Power-Ohio, Inc | — | — |
| Status | Operating | — | — |
The Quakertown PA BTM power plant is located in Bucks County, Pennsylvania. It has a total capacity of 10.8 MW across 4 generators, utilizing Distillate Fuel Oil (DFO) as its primary fuel source with Petroleum Liquids technology. The plant began operating in 2023 and is operated by American Mun Power-Ohio, Inc.
The plant resides within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In its latest year of operation, the plant generated 544 MWh, achieving a capacity factor of 0.6%. The Quakertown PA BTM plant is ranked 20th out of 31 similar plants in Pennsylvania, and 319th out of 886 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
41 MWh
Latest Month
544 MWh
Annual Generation
0.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1334 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
27 lb/MWh
SO₂
2 lb/MWh
CH₄
0.054 lb/MWh
N₂O
0.011 lb/MWh
Capacity Factor
0.0%
Annual Net Gen
0 GWh
CO₂eq
1338 lb/MWh
Subregion
RFC East
2023
$906/kW
Est. Construction Cost
Total estimated cost: $9.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Quakertown Substation · 69 kV
Substation Distance
0.083 km
Operator
PPL
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
QUAK_PL 69 KV QUAK2_LD
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Quakertown PA BTMForward forecasts, scenario decomposition, and risk-decision tooling for this asset.